Case Studies

Wilko

We transformed the carbon footprint of this well-known retailer, with very little disruption to their busy 400+ stores across the UK.

60%
reduction in HVAC energy consumption
800
motors installed in 14 months
3
years to ROI

Motorway Service Provider

Moto is the UK's largest motorway service provider, serving 120 million customers annually across over 60 sites. The retrofit delivered:

134K
kilowatt-hours saved
38%
cost and energy savings of 38% per annum
2.6
years to ROI
52
tonnes of CO₂ saved

Major European Airport Hub

We’ve significantly improved the HVAC system in one of the biggest and busiest airports in the UK, improving their energy consumption and how they control it.

56%
fan energy savings when operating at multispeed
21K
kilowatt hours saved annually
1.9
years to ROI

Large Inner City Shopping Centre

After measuring the existing motor performance of this popular shopping centre we installed the Turntide Smart Motor System and saw dramatic results.

6.051
kilowatt-hours saved
1.87
tonnes of CO₂ saved
3
years to ROI

Luxury Car Manufacturer

This forward-thinking UK car manufacturer entrusted us with improving its energy usage efficiency, and we responded by delivering a 40% overall energy saving.

6
largest air handling units replaced in 3 months with minimal disruption
40%
energy saving